Flathead County Transportation Planning: Flathead County Commissioners recently selected RPA to complete a county-wide transportation plan. Project Manager: Jeff Key, PE.
Plains Airport: The Kalispell office is assisting with construction administration services. Project Manager: Rick Donaldson, PE.
Kalispell Area Transportation Plan: Collection data and analysis is underway for a City and area-wide transportation plan for the community. Project Manager: Jeff Key, PE.
Baker Commons Phase II Subdivision: A site development project comprised of seven lots on approximately 16.2 acres that will soon begin with the design of 1500 feet of new roadway, a storm water drainage management plan, and a sewer for a new subdivision located in the southwest corner of Baker Avenue and 13th Street in Whitefish. Project Manager: Ryan Mitchell, PE, PLS.
Big Fork Hydro: Recreation Enhancement project designing fishing access sites for PacifiCorp. Project Manager: Ryan Mitchell, PE, PLS.
Whitefish River Crossing: Reviewed the design and is currently performing field inspection on an underwater river crossing for a new water main. Project Manager: Ryan Mitchell, PE, PLS.
Whitefish Housing Authority: Drainage improvements plan for a new housing development. Project Manager: Ryan Mitchell, PE, PLS.
Cow Creek Sewer Interceptor: Preliminary Survey for a new sewer interceptor including control establishment, topographic survey and mapping, and level loops. Project Manager: Ryan Mitchell, PE, PLS.
Whitefish Streets Improvements: Colorado Avenue and Baker Avenue projects involved design, bid package, and construction management services. Project Manager: Ryan Mitchell, PE, PLS.
Kalispell Hilton Garden Inn TIS: Traffic Impact Study performed for the Hilton Garden Inn, a new 148-room hotel that includes a restaurant, casino, and conference center. Project Manager: Jeff Key, PE.
Kalispell Hilton Garden Inn: Field surveys and airspace drawings related to the existing and proposed Kalispell City Airport and the proposed Hilton Garden Inn were completed. The project includes drainage and storm water runoff, installation of utilities including a water main extension, and construction of an asphalt parking lot with three approaches to US Highway 93. Project Manager: Phil Porrini, PE.
Kalispell Turn Lanes: Design of turn lanes on Secondary Highway 424 to MDT standards to serve two new subdivisions outside of Kalispell. Project Manager: Tim Rusdal, PE.
Kalispell Water Tank and Groundwater Well: Performed a site selection study for a new groundwater well and a 2-million-gallon water tank on the northwest boundary of Kalispell. Phase II has begun, with the well drilled and design underway for the water tank and the well building. Project Manager: Craig Jenneskens, PE.
Kalispell Home Page